The Silver 7 project was evaluated through a comprehensive energy modeling exercise in accordance with ASHRAE 90.1-2016 requirements to assess its performance against a standard baseline building. The results indicated a 38% improvement in energy efficiency over the base case. This significant reduction in energy use was achieved through a combination of strategies: a high-performance building envelope designed to minimize heat transfer and infiltration; energy-efficient lighting systems integrated with advanced daylight and occupancy controls to reduce unnecessary usage; and a high-efficiency HVAC system optimized for load management and thermal comfort. Together, these measures not only reduced operational energy demand but also supported the project's sustainability objectives and long-term operational cost savings.